According to the Standards: Flexible (plastic or rubber) DPC used as a cavity tray should be designed to prevent the downward passage of water or moisture through the tray. Cavity trays should be provided at interruptions to the cavity (e.g. window and door openings. and air bricks) unless otherwise protected. They must meet the requirements of.. A cavity tray should be provided to direct any water that enters the cavity to the outside. The cavity tray should fully protect the opening. At the horizontal abutment of all roofs over enclosed areas and balconies to walls. A cavity tray should be provided 150mm above any adjoining roof or balcony surface.

Cavity Trays installed by Superpoint can be the solution to dampness problems

What are cavity trays?
Building Guidelines Cavity walls DPC's
Building Guidelines Cavity walls Cavity Trays
Building Guidelines Cavity walls DPC's

What is DPC Damp Proof Course? DPC Material and Detailed Information Civil Site
External wall insulation below DPC DIYnot Forums

Gas Resistant DPC (Damp Proof Course) Designed for combined damp proofing and gas protection

Sheetseal 9000 DPC & Cavity Trays RIW Products

6.1.17 DPCs and cavity trays NHBC Standards 2018 NHBC Standards 2018

overview for Anaksanamune

6.1.17 DPCs and cavity trays NHBC Standards 2020 NHBC Standards 2020

Level Threshold Openings An Easy Method of Ensuring Damp Protection Integrity Threshold
DPC and Ground Level Foundations

Ventilation Cavity Walls & Retaining Walls 50 x Natural/Clear Brick Weep Vents Business

Cavity in Parapet Wall Cavity wall, Cavity wall insulation, Wall systems

DPC & cavity tray installation Riverside Doctors Surgery Bovey Tracey YouTube

6.1.17 DPCs and cavity trays NHBC Standards 2018 NHBC Standards 2018
Building Guidelines Cavity walls DPC's

DPC & cavity tray installation Riverside Doctors Surgery Bovey Tracey YouTube
Approved Document C requires that to prevent rising damp, a damp-proof course should be: · Continuous with any damp-proof membrane on the floor. · At least 150mm above the level of the adjoining ground or paving level if it's an external wall. · If inside an external cavity wall, the cavity should extend at least 225mm below DPC, or a.. Cavity trays also have to be installed at the bottom of walls, but this will only apply if the cavity does not extend 225 mm below the DPC. Do you need a cavity tray at the DPC level? Cavity trays don't have to be installed at DPC levels. The cavity below the DPC should be filled with concrete up to a level of 225 mm below it.